Saturday 27 June 2020

GTR 6 July timetable summary
1. Increase of 234 GTR services, to 87% of pre-covid weekday service.
11 percentage point increase in AM peak capacity –
especially between 06:00 and 07:30 to support staggered journeys 
2. Southern 
1. Additional peak metro services (Sutton to London Victoria via
Selhurst 2tph > 4tph) + 2TPH London Bridge to London Victoria
2.Direct services to Milton Keynes from Clapham Junction until the early evening
3. Longer trains between Redhill and London Victoria 4. Longer trains between Sussex Coast
and London Victoria during peak hours
5. Additional peak services on East Coastway, Arun Valley, Epsom and East Grinstead routes 
3. Thameslink 
1. Two fast services from Bedford in the peak
2. Peak time services from East Grinstead to Bedford, Littlehampton to Bedford,
Orpington to Luton / Kentish Town 
4. Great Northern 
1. Higher frequency on GN Metro route to Moorgate (4TPH on both branches for most of the day)
2. Peak fast services to Peterborough
3. Baldock to King’s Cross service
4. Additional Cambridge to King’s Lynn / Ely services 

No comments:

Post a Comment